2022-2023 Combined Capital Improvement Projects

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

This project has been completed.  

The 2022-2023 Combined Capital Improvement Projects included several different projects.  These projects include waterline, street, sewer and drainage projects. Below is a description of each project:

  • Lone Oak Trail Improvements
    • Construct a turnaround at the end of the street for emergency vehicle access.
    • Construct a waterline looping Lone Oak Trail with Curley Mesquite Cove.
    • Increase waterline size at the intersection of Jones Road and Lone Oak Trail to improve flow.
    • Mill and overlay the entire street
  • Sunset Trail Improvements

    • Replace existing waterlines with an 8 inch line.
    • Install additional fire hydrants.
    • Mill and overlay entire street.
  •  Jones Road and Sunset Trail Drainage
    • Construct drainage inlets along Jones Road.
    • Construct a narrow concrete channel along a portion of the drainage ditch along Sunset Trail to maintain positive drainage.  
  • Highway 290 Sewer Line
    • Replace the sewer line along the north side of Highway 290
  •  AISD Meter Conversion
    • Convert the properties belonging to Austin Independent School District to customers of Sunset Valley for water service.
  • Oakdale Backflow 
    • Replace 6 inch backflow with a 8 inch backflow. 

Project Status

The City Council awarded a bid to Smith Contracting to complete this project.  This project started on April 17th, 2023. 

 

 

Click here to see the plans for this project.

Documents

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer