This project includes several different goals. From repairing pavement to improving pedestrian access and safety, these projects will improve the area for drivers, pedestrians and bicyclists.
Ernest Robles Way
-
Pavement repairs including replacing pavement that has subsided or cracked. This includes several large sections near Brodie Lane where water pools. These areas will be repaired to allow water to drain correctly. Additionally, areas will be repaired that have cracked. Areas that have raised will be ground down to make a smoother surface. Joint material will also be replaced between the panels.
-
The area around the bridge will have several repairs including fixing the storm drains around the the bridge. The limestone facing of the wingwalls for the structures will also be repaired. The guardrail does not meet state crash cushion standards and will also be upgraded.
-
Raised crosswalks will be installed at the crossing near Upper Cougar Creek and at the crossing near the intersection of Sunflower Trail and the Homestead Shopping Center. This will allow pedestrians to cross safely and help to calm traffic on the street.
Home Depot BLVD
-
The water meter vault along the road has had a drain installed to remove water that enters into the vault.
Ernest Robles Way Project Update (August 19,2025)
This project is in its final stage. Construction is completed and the project is awaiting fulfillment of a few punch list items to reach substantial completion.
Project Start Date: January 6, 2025
The City of Sunset Valley began a construction project on Ernest Robles Way on January 6, 2025. The majority of the work was completed by May 2025.
Engineering Task Orders-This project originally included road and pedestrian upgrades to Home Depot BLVD. These projects were removed from the project to be completed with the first phase of Reimagine Brodie. The engineering for those projects will be concluded with Re-imagine Brodie.
|
Activity |
Cost |
Approval |
|
Amendment No. 5. |
$51,298.40 |
Council Approval 12/19/2023 |
|
Amendment No. 4-ERW Crosswalks, HDB Surveying |
$28,395.00 |
Council Approval 5/16/2023 |
|
Amendment No. 3-HDB Traffic Study |
$30,475 |
Council Approval 5/16/2023 |
|
Amendment No. 2-Home Depot Blvd Surveying |
$3,450.00 |
Mayoral Approval |
|
Amendment No. 1-Home Deport Blvd. Sidewalk |
$36,205.00 |
Council Approval 2/7/2023 |
|
Original Task Order-Home Depot/ERW Street Repairs |
$126,000.00 |
Council Approval 9/27/2022 |
|
Total Task Order |
$275,823.40 |
|
Construction Cost of Project as of August 2025-$2,027,713.13